News

    News Releases

    November 2, 2023

    Cartier Reports High-Grade Silver, Lead and Zinc Values from Systematic Channel Sampling of the Underground Artisanal Workings at its Gonalbert Property, Southern Bolivia


    • Highlights from the Mina Central Adit include:
      • 512.5 g Ag/t & 14% Pb over 58m strike & average width of 0.5m (Level -40).
      • 132.40 g Ag/t & 7.1% Pb over 117m strike & average width of 0.4m (Level -40).
      • 153.7g Ag/t & 7% Pb over 20m strike & average width of 0.9m (Level -60).
      • 223.9 g Ag/t & 5.0% Pb over 30m strike & average width of 0.7m (Level -80).
      • 239.5 g Ag/t & 11% Pb over 125m strike & average width of 0.9m (Level -100).
      • 242.5 g Ag/t & 11% Pb over 164m strike & average width of 0.9m (Level -100)
      • 343.2 g Ag/t & 15% Pb over 40m strike & average width of 0.8m (Level -100).
    • Underground artisanal workings were sampled over a strike extent of 2km with results from 368 samples reported in eight principal artisanal working areas.
    • Areas of potential high grade Ag mineralization targets outlined from underground channel sampling correlate very well with strong chargeability anomalies.
    • A relatively strong chargeability anomaly extending northwards from the Mina Central area for approximately 700m is a prime target for further drilling.
    • Previously reported Hole DGL-01 that intersected 49.19 g Ag/t, 1.35% Zn & 1.31% Pb over 44.76m tested a deeper strong chargeability anomaly below Mina Central confirming potential for wider zones of higher-grade Ag mineralization at Gonalbert.

    TORONTO, Nov. 02, 2023 (GLOBE NEWSWIRE) -- Cartier Silver Corporation (CSE: CFE) (“Cartier Silver” or the “Company”) is pleased to report results from an extensive underground channel sample in eight principal areas over a strike length of 2km on the Gonalbert property, Potosi Department, Bolivia. The Company also recently completed a 3-hole, 1,364.8m reconnaissance drill program to test geophysical and geological targets for epithermal Ag-Pb-Zn mineralization. Results from the final two holes are reported.

    Tom Larsen, CEO of Cartier Silver, commented: “We are very encouraged by the widespread high-grade silver values along with significant lead and zinc values obtained in the systematic underground channel sampling of artisanal workings across a 2km strike length on the property. The strong correlation of the target areas defined by this work with the strong chargeability anomalies is impressive. Results from initial drill hole DGL-01 which intersected 49.19 g Ag/t, 1.35% Zn & 1.31% Pb over 44.76m below the Mina Central Adit workings confirms the potential to outline much wider higher grade silver zones in areas with artisanal workings and coincident strong chargeability anomalies.”

    Dr. Osvaldo Arce, P.Geo., General Manager of Cartier Silver’s Bolivian subsidiary, Minera Cartier S.R.L. said: “Systematic channel sampling in underground workings at the Gonalbert property has confirmed the high-grade nature and extensions of silver-rich structures with increasing grades at depth. These are important targets for further diamond drilling. Additionally, the surface geological reconnaissance of the Bolivian polymetallic-type mineralization away from the historic mines, reveals mineral continuity in an area that has not been historically explored, which significantly expands the enormous exploration potential.”

    UNDERGROUND CHANNEL SAMPLING

    Table 1 lists the underground channel sampling and sample record for the Gonalbert property. A total of 368 channel samples were collected. Average sample width was 1.1m. Sampling was carried out along both the ENE and NNW-oriented drifts on the principal production levels, including Level 0, -40, -60, -80, -100, -125, -150, -160 and -180 at the Mina Central adit, and at the La Hoyada, Tacoyoj and Victoria adits. Underground workings are distributed over an area 2 km along strike as shown in Figure 1.

    Table 1. Underground channel sampling and samples record at the Gonalbert property.

    UG WORKINGLEVELSAMPLES COLLECTEDASSAYS RECEIVEDASSAYS PENDING
    MINA CENTRAL012120
    MINA CENTRAL-20330
    MINA CENTRAL-4019190
    MINA CENTRAL-60660
    MINA CENTRAL-80880
    MINA CENTRAL-10021210
    MINA CENTRAL-125660
    MINA CENTRAL-14021210
    MINA CENTRAL-150220
    MINA CENTRAL-16014140
    MINA CENTRAL-180660
    LA HOYADA2026260
    LA HOYADA055550
    LA HOYADA-3042420
    VICTORIA 1020200
    VICTORIA 2013130
    RIELES026260
    TACOYOJ015150
    TACOYOJ 10909
    CELIA027270
    ISABEL017170
    TOTAL3683599


    Systematic channel sampling was performed by cutting channels across the mineralized zone in the underground mine workings including the mine face, walls, and back. The area was first cleaned to remove dust, dirt, slime, and soluble salts. A linear horizontal channel was then cut between two marked lines at a uniform width and depth. The width was about 10 cm at a depth of 10 mm. Sample length varied depending on variation in mineralization but typically channels were between 1 and 2 m across the mineralized zone. The standard tools were hammer and a sharp pointed end chisel made of drill steel. While the sampler cuts the channel, a second person collected chips, fragments, and fines in a clean box, sack, or on a canvas sheet spread on the floor. A sample of 1 m length weighed approximately 1-2 kg which was then sent for assay.

    Underground channel samples and drill samples are prepared in ALS Bolivia Ltda’s preparation facility in Oruro, Bolivia with pulps sent to the main ALS Global laboratory in Lima for analysis. In addition, other assay protocols have been changed to provide for a more accurate measurement of the wide-ranging suite of polymetallic metals at the Gonalbert property. Cartier Silver employs an industry standard QA/QC program with standards, blanks and duplicates inserted into each batch of samples analyzed with selected check samples sent to a separate accredited laboratory.

    DISCUSSION OF RESULTS

    Table 2 summarizes the channel sample results from the major artisanal workings. Figure 1 is a geological map showing the main potential high grade Ag mineralization targets as indicated by channel sampling of underground workings. Figure 2 is a geological and sampling plan map of Mina Central, Level -40, the first level with high values of silver and Figure 3 is a geological and sampling map of Mina Central, Level -100.

    Table 2. Summary of Underground Channel Sampling Results at Gonalbert property.

    UG WorkingLevelMineralized intervals
    No. of samplesInterval Length (m)Average channel width (m)Ag (g/t)Pb (%)Zn (%)
    MINA CENTRAL GROUP 10102700.972.61.70.06
    MINA CENTRAL GROUP 202370.922.30.80.01
    MINA CENTRAL-202121.7137.24.60
    -201120.852.31.40
    MINA CENTRAL GROUP 1-407580.5512.5140.02
    MINA CENTRAL GROUP 2-40101170.4132.47.10.07
    MINA CENTRAL GROUP 3-40190.247.83.10.02
    MINA CENTRAL-604200.9153.770.02
    MINA CENTRAL-805300.7488.313.40.02
    MINA CENTRAL GROUP 1-10081250.9239.5110.04
    MINA CENTRAL GROUP 2-100101640.7242.510.70.05
    MINA CENTRAL GROUP 3-1003400.8343.214.50.03
    MINA CENTRAL GROUP 1-1252130.3563.614.57.7
    MINA CENTRAL GROUP 2-1254330.8172.99.812.2
    MINA CENTRAL-140202570.7104.34.510.3
    MINA CENTRAL-150240.6311.513.710.7
    MINA CENTRAL GROUP 1-16041361.21355.517.4
    MINA CENTRAL GROUP 2-1605760.868.53.66.9
    MINA CENTRAL GROUP 1-1802640.9216.88.82.8
    MINA CENTRAL GROUP 2-1802362.1230.711.8
    QUIMBALETE ADIT GROUP 120181291.521.61.30.2
    QUIMBALETE ADIT GROUP 220429164.72.31.8
    MINA LA HOYADA GROUP 106291.338.21.91.8
    MINA LA HOYADA GROUP 206411.276.33.10.4
    MINA LA HOYADA GROUP 3019901.167.83.15
    MINA LA HOYADA GROUP 1-30322411.214.90.71.3
    MINA LA HOYADA GROUP 2-3011561.537.31.93.5
    VICTORIA ADIT GROUP 103351.3184.43.80.3
    VICTORIA 1 ADIT GROUP 2017971.433.11.20.2
    VICTORIA 2 ADIT0110.51.551.11.50.2
    RIELES ADIT GROUP 10844.5131.11.40
    RIELES ADIT GROUP 205151.846.42.10
    RIELES ADIT GROUP 304221.388.81.10
    TACOYOJ ADIT015981.420.30.60.01
    CELIA ADIT GROUP 101793149.32.50.03
    CELIA ADIT GROUP 20648160.21.80
    ISABEL ADIT015611.2133.94.70.1

     

    Figure 1: Geological plan map showing locations of principal underground workings sampling and the main potential high grade Ag mineralization targets as indicated by results of channel sampling of underground workings.

    Geological plan map showing locations of principal underground workings sampling and the main potential high grade Ag mineralization targets as indicated by results of channel sampling of underground workings.

    Figure 2 – Geological and sampling map of Mina Central, Level -40, the first level with high values of silver

    Geological and sampling map of Mina Central, Level -40, the first level with high values of silver

    Figure 3 – Geological and sampling map of Mina Central, Level -100, with high values of silver across the level

    Geological and sampling map of Mina Central, Level -100, with high values of silver across the level

    RECONNAISSANCE DIAMOND DRILLING

    Three (3) holes totaling 1,364.8m were drilled on the Gonalbert property. As shown in Figure 1, Holes DGL-01 to DGL-03 were drilled in the southern side of the property. Drill holes were designed mainly to test geophysical and geological targets (Figure 2) for epithermal Ag-Pb-Zn mineralization (Figure 1 and Table 3).

    Table 3. Diamond Drill Hole Coordinates at Gonalbert Property

    Hole No.EastingNorthingElev.AzimuthInclinationEnd of Hole
    DGL-01219000.07637460.03669.560°-70°457.0
    DGL-02219214.77637583.93581.860°-70°275.5
    DGL-03218742.27637542.23596.360°-50°632.3
       TOTAL METERAGE1364.8


    Previously released Hole DGL-01 intersected 49.19 g Ag/t, 1.35% Zn, and 1.31% Pb over 44.76m which includes a higher-grade interval of 137.42 g Ag/t, 7.91% Zn and 5.6% Pb over 5.60m.

    Other significant intersections in DGL-01 include:

    • 57.74 g Ag/t and 1.75% Pb over 18.25m including 79.90 g Ag/t and 2.53% Pb over 6.63m
    • 109.54 g Ag/t, 3.68% Zn and 4.44% Pb over 11.09m including 170.01 g Ag/t, 2.51% Zn and 7.00 % Pb over 5.81m

    Drill hole DGL-02 did not intercept any significant mineralization and did not reach the designed targets because of difficult ground conditions (intense faulting).

    Drill hole DGL-03, was drilled to test the Central Vein mineralization, intersecting some mineralized base metals intervals hosted in Ordovician sediments cut by tectonic breccias and dacitic dykes. This hole intersected widespread lower-grade sphalerite, galena, pyrite, siderite, and quartz in vein breccias, veins, veinlets, and dissemination. Significant results are listed in Table 4. Highlights are as follows:

    • 32.0 g Ag/t, 4.16% Zn and 0.98% Pb over 0.5m.
    • 89.4g Ag/t, 0.26% Zn and 2.99% Pb over 2.57m.
    • 37.0g Ag/t, 1.25% Zn and 1.0% Pb over 0.5m.
    • 36.0 g Ag/t, 1.2% Pb over 2.07m

    Table 4. Significant Results of Hole DGL-03 at Gonalbert property, Chorrillos Project

    Hole No.
    From (m)
    To (m)
    Length (m)
    AgAuZnPbCuSnBiCd
    g/tg/t%%%%%%
    DGL-0348.6449.681.0425.00.0200.0040.130.0070.0140.00050.0005
    185.93186.430.5032.00.0504.160.980.0180.0240.00400.0210
    262.30265.384.637.360.0760.0820.0640.0500.0080.03240.0005
    317.42324.487.069.590.0210.380.380.0170.0070.00160.0017
    402.20403.731.537.000.0050.300.210.0020.0120.00050.0020
    456.10456.600.5037.00.0401.251.010.0180.0180.01500.0060
    470.56473.132.5789.40.0260.262.990.0160.0140.00080.0011
    497.66499.732.0736.00.0100.0281.240.0090.0030.00100.0005
    592.24596.13.8625.00.0100.0040.130.0370.0150.04800.0005


    Figure 4 shows the locations of potential high grade Ag mineralization targets on the n=4 chargeability grid that corresponds to a depth of approximately 100m below the surface. A strong chargeability anomaly extends northward from the Mina Central Area for approximately 700m and represents a priority target for drilling. Figure 5 is a chargeability section showing drill holes DGL-01 and DGL-02. DGL-01, which returned the most significant intersections intersected the deeper strong chargeability anomaly below Mina Central whereas hole DGL-03 was on the flank of this anomaly, explaining the relatively few intersections in this hole.

    On the plan chargeability map in Figure 4, it is evident that there is gap in the mineralization or possible structural break between the deeper chargeability anomaly intersected in hole DGL-03 and the shallower chargeability anomaly to the north. This strong correlation of the chargeability anomaly with the significant intersection in hole DGL-01 and with the artisanal mine workings hosting high-grade Ag veins is very encouraging. This indicates that there is potential for much wider higher grade silver zones on Gonalbert.

    Figure 4: Plan Map with Drill Holes Completed Showing Model Chargeability and Correlation of Chargeability with Potential High Grade Silver Target Areas Outlined by Underground Channel Sampling.

    Plan Map with Drill Holes Completed Showing Model Chargeability and Correlation of Chargeability with Potential High Grade Silver Target Areas outlined by Underground Channel Sampling


    Figure 5: Cross Section of Model Chargeability with Drill Holes DGL-01 and DGL-02

    Cross Section of Model Chargeability with Drill Holes DGL-01 and DGL-02

    Qualified Person

    Dr. Bill Pearson, P.Geo., a Qualified Person (QP) as defined under National Instrument 43-101 (NI 43-101), has reviewed & approved the scientific & technical content of this press release. Dr. Chris Hale, P.Geo., supervised the geophysical surveys. Geological surveys, diamond drill logging and underground channel sampling were supervised by Dr. Osvaldo Arce, P.Geo.  Messrs. Hale and Arce, are QPs as defined by NI 43-101.

    Cartier Silver utilizes both ALS & AHK for drill core analysis, both of whom are major international accredited laboratories. Drill samples sent to ALS are prepared in both ALS Bolivia Ltda’s preparation facility in Oruro, Bolivia & the preparation facility operated by AHK in Tupiza with pulps sent to the main ALS Global laboratory in Lima for analysis. Cartier Silver employs an industry standard QA/QC program with standards, blanks & duplicates inserted into each batch of samples analyzed with selected check samples sent to a separate accredited laboratory.

    Drill core samples sent to AHK Laboratories are prepared in a preparation facility installed & managed by AHK in Tupiza with pulps sent to the AHK laboratory in Lima, Peru. Check samples between ALS & AHK are regularly done as a QA/QC check. AHK follows the same analytical protocols used as with ALS & with the same QA/QC protocols.

    About Cartier Silver Corporation

    Cartier Silver is an exploration and development Company focused on discovering and developing its recently acquired silver property assets, including the Chorrillos Project and claims staked by the Company’s subsidiary, all of which are located in the Potosi Department of southern Bolivia. The Company also holds significant iron ore resources at its Gagnon Holdings in the southern Labrador Trough region of east-central Quebec, and the Big Easy gold property in the Burin Peninsula epithermal gold belt in the Avalon Zone of eastern Newfoundland & Labrador. 

    For further information please visit Cartier Silver’s website at www.cartiersilvercorp.com

    For further information please contact:

    Thomas G. LarsenJorge Estepa
    Chief Executive Officer
    (800) 360-8006
    (416) 360-8006
    Vice-President
    (800) 360-8006
    (416) 360-8006
      

    The CSE has not reviewed nor accepts responsibility for the adequacy or accuracy of this release.

    Statements in this release that are not historical facts are “forward-looking statements” & readers are cautioned that any such statements are not guarantees of future performance, & that actual developments or results, may vary materially from those in these “forward-looking statements”.

    Photos accompanying this announcement are available at:
    https://www.globenewswire.com/NewsRoom/AttachmentNg/6aa84d4b-fbc0-4b14-ab8c-7777fa78bb5f
    https://www.globenewswire.com/NewsRoom/AttachmentNg/a8738346-038d-427f-8904-68dd838cc37a
    https://www.globenewswire.com/NewsRoom/AttachmentNg/74860622-f725-4265-8262-bcb0f8764f51
    https://www.globenewswire.com/NewsRoom/AttachmentNg/4e175e15-9a5f-4f4f-8678-ef0fb3841a11
    https://www.globenewswire.com/NewsRoom/AttachmentNg/cfb06404-9f16-48f4-8104-a67b89ae89f3

    PDF available: http://ml.globenewswire.com/Resource/Download/efece325-d46c-4f8e-be67-c889c6f47ed3


    Cartier-Silver-Corporation.png

    You can view the Next News Releases item: January 15, 2024, Cartier Provides Update on its Chorrillos Project, Southern Bolivia

    You can view the Previous News Releases item: September 7, 2023, Cartier Silver Intersects 49.19 g Ag/t, 1.35% Zn and 1.31% Pb over 44.76m in Discovery Hole on the Gonalbert Property, Potosi Department, Southern Bolivia

    You can return to the main News Releases page, or press the Back button on your browser.



    ©2024Cartier Silver
    All rights reserved.
    Disclaimer